Customization: | Available |
---|---|
After-sales Service: | Support |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 30/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
We specialize in all types of Pole Anchor, Post Support, Ground Anchor, Post Saddles, Angle Brackets, Timber Connector & sheet metalworking / stamping, metal pressing and can manufacture custom pressed metal parts.
Our main production and processing are all type of precision sheet metalworking/ stamping parts, custom-made precision metal stamping, welding assembly parts, Laser-cutting metal parts.
Our precision sheet stamping parts includes Brackets, Strut Channel Brackets, Cable anchor brackets,Frame, Vehicle Processing Parts, Automobile Spare Parts, Medical Device Parts, Industrial Machines, Electric Appliance Parts, Furniture Parts, Agricultural Machinery, Electronics, Construction, Machinery Parts and so on.
Main products:Metal Stamping,Sheet Metalworking,Metal Brackets,Metal Fabricated,metal laser cutting,Mounting plate,Wood connectors, Post anchor, Post base, Ground anchor, Post support, auto parts,Post Brackets,Adjustable Post Base,Sheet Bending,etc
Machine Facilities List | ||
No | Name | Quantity |
1 | 6000W Fiber Laser Cutting Machine | 1 |
12000W Fiber Laser Cutting Machine | 1 | |
3000W Fiber Laser Cutting Machine | 2 | |
1500W Fiber Laser Cutting Machine | 1 | |
3000W Laser Tube Cutting Machine | 2 | |
2 | 3D five-AXIS OPTICAL FIBER Laser Cutter | 1 |
3 | CNC Welding Robot | 2 |
4 | 250 Ton CNC Bending Machine | 1 |
80 Ton CNC Bending Machine | 1 | |
5 | 630 Ton Oil Hydraulic Press Machine | 1 |
500 Ton Oil Hydraulic Press Machine | 1 | |
315 Ton Oil Hydraulic Press Machine | 1 | |
6 | 400Ton Punch Machine | 3 |
250 Ton Punch Machine | 3 | |
160 Ton Punch Machine | 2 | |
125 Ton Punch Machine | 3 | |
100 Ton Punch Machine | 2 | |
80 Ton Punch Machine | 1 | |
63 Ton Punch Machine | 1 | |
40 Ton Punch Machine | 1 | |
35 Ton Punch Machine | 1 | |
7 | Double Bending Tube Machine | 1 |
CNC Tube Bending Machine | 1 | |
8 | Shot blasting Machine | 2 |
9 | Shearing Machine Machine 16X2500 | 2 |
Shearing Machine Machine 6X2500 | 1 | |
10 | 500A Gas Shield Welder | 10 |
350A Gas Shield Welder | 5 | |
TIG Welder | 5 | |
11 | CNC Sawing Machine | 1 |
We provide all types of Post anchor, wood connector & sheet metal fabrication metalworking / stamping and Laser cutting. Beyond the stamping service include Blanking, Deep-drawing, Bending, Punching, Drawing, Piercing, laser cutting, welding, and deburring operations. We also will provide surface treatments such as Polishing, Galvanizing, Heat Treating, Painting,etc
Q: Are you a trading company or manufacturer? A: We are a factory with a trading department.
Q: Is OEM/ODM service available? A: Yes, we can accept OEM/ODM. Please provide your requirements or drawings (e.g., material, quantity, tolerance, 3D file, surface treatment, special requirements), and we'll follow up as soon as possible.
Q: Can you provide samples? Are they free or extra? A: Yes, we can provide samples for free, but the transportation charge is not included.
Q: What finishing options do you offer? A: We offer white/yellow zinc plating, hot dip galvanized, powder coating, stainless steel, painting, and more.
Q: What are your terms of payment? A: Our payment terms are 30% deposit and 70% against the copy of the bill of lading. We also accept L/C at sight.
Q: How long is your delivery time? A: The delivery time is about 30 days for a 20' container. The details depend on the actual orders.
Q: How do you control the quality of the products? A: We have strict quality control procedures during production and upon order completion.